PVPP 38MW BULBUCATA

Project Information
  • Customer:
    CJR LUSO ENERGIE SRL
  • Date:
    01/08/2024 - 15/03/2025
  • Location:
    Bulbucata , Romania
  • Category:
    Renewable Energy
  • Industry:
    Energy Sector
Project Description

The subject of this contract covers all the necessary works and services required to ensure the accurate and comprehensive execution of key mechanical works for a solar park project. These works are essential to the structural and functional setup of the photovoltaic (PV) system, ensuring both the stability and efficiency of the installation.

  • Ramming of Fixed Structure Foundations
    The contract involves the ramming (driving) of the fixed structure foundations into the ground at depths of 1.5m and 1.8m, depending on the site’s geotechnical conditions. Ramming ensures the stability and durability of the structure, providing a strong base to support the solar panels throughout the system’s lifetime. By anchoring the structures at these depths, the installation can withstand various weather conditions and loads, ensuring the integrity and longevity of the solar park’s infrastructure.

  • Installation of Fixed Structures (2P12 and 2P24)
    The fixed structures, specifically 2P12 and 2P24, are vital components that support the PV modules. These structures are designed to hold either 12 or 24 solar panels in two rows (2P), ensuring they are tilted at the correct angle to maximize solar exposure. The installation of these structures includes assembling, positioning, and securing them to the ground, providing the necessary foundation for the solar panels. The choice between 2P12 and 2P24 configurations depends on the specific design and energy production goals of the solar park.

  • Installation of PV Modules
    The contract includes the precise installation of photovoltaic (PV) modules. These modules are the core of the solar energy generation system, converting sunlight into electrical energy. Each module will be carefully mounted onto the supporting structures, ensuring optimal positioning and secure fastening to withstand environmental conditions like wind and weather changes. Proper installation is critical to the long-term performance and efficiency of the solar park.

This contract encompasses not only the physical construction and assembly but also all the necessary services to guarantee that the installation is performed with precision and meets all technical and regulatory standards. From foundation ramming to the secure installation of PV modules, every step is managed to ensure a reliable and high-performing solar park.

Project Information
  • Customer:
    CJR LUSO ENERGIE SRL
  • Date:
    01/08/2024 - 15/03/2025
  • Location:
    Bulbucata , Romania
  • Category:
    Renewable Energy
  • Industry:
    Energy Sector